EXPEDIENT SOFTWARE

Going beyond software performance.

Release 02/09/15 – AU/NZ Management Module – Improvement to WIP Reports

This release includes cosmetic enhancements to the WIP Reports, along with minor improvements.

NOTE: There has been NO change to the calculation of any of the columns.

For more information, please view the General Ledger User Guide.

WIP REPORTS

Below is a list of the main enhancements that have been made to the WIP Reports:

  • CSV format changed to XLS
  • Default to XLS Report Format
  • PDF version shown in Landscape Format
  • Profit & Forwarder columns have been removed from the Cost Code Report as they were not used
  • The Statistics Summary & Detailed Reports have been migrated into 1 Report Parameter Screen. Which means you can run either of these reports from a single location
  • The Job Balances & Consol Balances Reports have been migrated into 1 Report Parameter Screen. Which means you can run either of these reports from a single location
  • Forwarding Column has been removed from the Consol Balances Report as information is not stored
  • PDF versions of the WIP + Profit Import & Export Reports have been removed – the WIP + Profit Enquiry Screen can be used or the reports can still be run as a XLS version
  • Date Formats now show DD/MM/YYYY

Please see below screenshot for the PDF Version.

Please see below screenshot for the XLS Version.

 

 

 

 

 

 

 

 

 

 

Updated: August 31, 2015 — 3:47 am
EXPEDIENT SOFTWARE GUIDE © 2015