This release includes cosmetic enhancements to the WIP Reports, along with minor improvements.
NOTE: There has been NO change to the calculation of any of the columns.
For more information, please view the General Ledger User Guide.
WIP REPORTS
Below is a list of the main enhancements that have been made to the WIP Reports:
- CSV format changed to XLS
- Default to XLS Report Format
- PDF version shown in Landscape Format
- Profit & Forwarder columns have been removed from the Cost Code Report as they were not used
- The Statistics Summary & Detailed Reports have been migrated into 1 Report Parameter Screen. Which means you can run either of these reports from a single location
- The Job Balances & Consol Balances Reports have been migrated into 1 Report Parameter Screen. Which means you can run either of these reports from a single location
- Forwarding Column has been removed from the Consol Balances Report as information is not stored
- PDF versions of the WIP + Profit Import & Export Reports have been removed – the WIP + Profit Enquiry Screen can be used or the reports can still be run as a XLS version
- Date Formats now show DD/MM/YYYY
Please see below screenshot for the PDF Version.
Please see below screenshot for the XLS Version.

